Synchronising Panels

Synchronization Panels are mainly designed and used to mepwersystemrequirements: They will operateon an automatic mains failure system, so that when the main supplyinterrupted The Push Button Station ensures starting in oneor all phases afteranadjustable delayperiod)thegeneratorsets will kick-off together After an tor-up of motors / instruments.

Additional Description

Synchronization Panels are mainly designed and used to mepwersystemrequirements: They will operateon an automatic mains failure system, so that when the main supplyinterrupted The Push Button Station ensures starting in oneor all phases afteranadjustable delayperiod)thegeneratorsets will kick-off together After an tor-up of motors / instruments. These are die ized circuit breakers or contactors onto a common busar. Then the motorizedthangeoverswitch will beclosedancitheloadwill be connectedothemain distributionbox

The load shareunitscontinuouslymonitortheload. During low demand situations one or two genera And also have the capacity to withstand harsh weather conditions, explosions and erator will be restarted, synchronized and reconnected to the load. When tAMF control unit de tectsthatthemain supply has beenrestored an adjustable observation period is activated before the main flame. supply is reconnected A cool down period will thenfollow, after which thegeneratorsetswill beshut down.

Key features of Synchronizing Panels

  • Rated Operational Voltage:Up to 590V
  • 3-poleor 4-polesystemas required
  • Various combination of loadtransfer by ACBs, MCCBs or Contactors Index of protectionupto IP 66
  • Load sharing/loadhedding
  • Automatic and manual synchronizing
  • Dead front with rear accessor front access
  • Control functions available for engine monitoring, warm-up and cool down periods, emergency shutdown, multi attemptenginestartcontrol, Engine test runs
  • Suitable for both internal & external mounting (Weather)